Containers and planning permission – everything you need to know
The answer depends on several key factors: the length of time the container is to be used for, its intended purpose, and how it is to be situated on the plot. In this article, we discuss the current provisions of building law (in particular Article 29(1) and (1a) of the Act), the formal procedures, as well as specific cases in which a permit may be required. We also cite examples of the latest case law – including the judgment of the Provincial Administrative Court in Warsaw of 15 November 2022 (case no. VII SA/Wa 1044/22) – which illustrate how building control authorities interpret the issue of containers in practice.
Containers and planning permission – a summary of the formal requirements
Although the regulations can be rather confusing, a well-prepared list of typical scenarios allows you to work out fairly quickly whether a simple notification will suffice in a given case, or whether a formal planning permission will be required. It is worth bearing in mind, however, that every situation has its own nuances – and these can change everything. That is why it is so important to analyse planning documents thoroughly and, ideally, to look at the whole picture not only from the perspective of the regulations but also in terms of practical application. Because a container and a planning permission are not just a question of the type of structure. What also matters is how it is used and how long it will remain in a given location. And the difference between ‘temporary’ and ‘long-term’ can mean a completely different procedure
Depending on the type of container, its intended use and duration of use, different regulations apply regarding notification or obtaining planning permission. Below, we present a summary of the most common scenarios in the context of the current Building Act.
| Container type | Temporary (max 180 days) | Permanent (more than 180 days) |
| Office container |
Notification (Article 29(1)(12)) |
Planning permission required |
| Apartment container | Application (if temporary, without connections) | A planning permission is required (Article 29(1a) and (4)(1)) |
| Storage container | Application (if it meets the criteria for temporary status) | Planning permission required |
|
Farm building < 35 m² |
Lack of a licence (Article 29(1)(2)(c)) | No licence* |
|
Construction site facilities |
Lack of a planning permission (as part of a building project) | No planning permission (as part of the same development) |
* No planning permission is required, provided that the number and size of the buildings do not exceed the limits set out in Article 29(1)(2)(c) (one building for every 500 m² of plot area).
What should you bear in mind?
- If the container is to be used for a short period and without any installations, a simple notification is usually sufficient.
- If the module is to be used for longer than 180 days, will be connected to utilities or used as a dwelling – a planning permission will almost always be required.
- Container homes are treated in the same way as detached houses – they require full documentation.
- In the case of site facilities – if they form part of an approved development – a planning permission is not required.
- Even the absence of foundations does not exempt you from the formalities if the intended use indicates a permanent structure.
Each case requires individual analysis – including in terms of the local development plan and local regulations.